Multistorey Building

Slab & Slab Void layers

Default: 6″ (152.4 mm). Enter mm, cm, m, feet or inches. Slabs start at the wall top and extend upward by this thickness.

Draw closed horizontal outlines

Slab — outer slab boundary.
Slab Void — openings through the slab, for stairs, shafts or other cutouts.
Voids only cut slabs belonging to the same floor. Lines, arcs and curves must form a closed outline.